43.33LeafLevel 3
Building completion and finishing
This class includes: - laying, tiling, hanging or fitting in buildings or other construction projects of: • ceramic, concrete or cut stone wall or floor tiles, ceramic stove fitting • parquet and other wooden floor coverings, wooden wall coverings • carpets and linoleum floor coverings, including of rubber or plastic • terrazzo, marble, granite or slate floor or wall coverings • wallpaper
GET
/api/v1/systems/nace_rev2/nodes/43.33Official DownloadPublic Domain
Cross-system equivalences42
CAEM Rev 2 (Moldova)
KD BiH 2010
KD 2010 (Montenegro)
KD 2010 (Serbia)
KD 2010 (Kosovo)
KVED 2010 (Ukraine)
NACE Rev 2 (Armenia)
NACE-BEL 2008
NACE Rev 2 (Cyprus)
NACE Rev 2 (Georgia)
NACE Rev 2 (Ireland)
NACE-LU 2008
NACE Rev 2 (Malta)
NACE Rev 2 (Turkey)
NKD Rev 2 (North Macedonia)
NVE Rev 2 (Albania)