WoT
Pakistan Standard Industrial Classification (ISIC Rev 4 based) - Pakistan

3510 Electric power generation, transmission and distribution

PSIC (Pakistan) classification code 3510 covers "Electric power generation, transmission and distribution" at level 3 of the PSIC (Pakistan) hierarchy.

Level 31 cross-system mapping
Is your business really a 3510?Classify it

Where 3510 sits in the PSIC (Pakistan) hierarchy

  1. >D Electricity, gas, steam and air conditioning supply
  2. >35 Electricity, gas, steam and air conditioning supply
  3. >>351 Electric power generation, transmission and distribution
  4. >>>3510 Electric power generation, transmission and distribution
  5. >>>3510 Electric power generation, transmission and distribution

3510 in other classification systems

Equivalent and related codes across 1 other system. Click any code to see its full definition, hierarchy, and crosswalks.

Frequently asked questions

What is PSIC (Pakistan) 3510?
PSIC (Pakistan) 3510 is "Electric power generation, transmission and distribution". PSIC (Pakistan) code 3510 covers "Electric power generation, transmission and distribution" at level 3 of the PSIC (Pakistan) hierarchy.
How does PSIC (Pakistan) 3510 map to other classification systems?
3510 Electric power generation, transmission and distribution has equivalents in ISIC Rev 4 (3510). These crosswalks let you translate this code between PSIC (Pakistan) and 1 other classification system.
What is the parent category of 3510?
3510 Electric power generation, transmission and distribution sits under 3510 Electric power generation, transmission and distribution in the PSIC (Pakistan) hierarchy.

Classify my business

Describe your business in plain English and get matching codes across PSIC (Pakistan) and other major systems.

Interactive browser

Open 3510 in the full interactive explorer with tree view, search, and drill-downs.

Source: Pakistan Bureau of Statistics (PBS)Version: 2010